In progressInstitutional project

Technical validation and quality assurance

Type checking, linting, production builds, responsive testing and accessibility checks against WCAG 2.2 AA practice before public launch.

Objectives

  • Pass type checks, linting and a production build
  • Check every page family on desktop and mobile
  • Complete keyboard and screen-reader testing

Deliverables

  • Clean production build
  • Accessibility and responsive QA report

Updates

No updates yet. Progress will be posted here as the project moves forward.

Related projects

CompletedInstitutional project

Multi-page platform architecture

Sterling IMRES founding team

The first technical build of the institutional website: a multi-page Next.js and TypeScript application with content hubs, dynamic detail routes and typed local content that can later move to a CMS or database.

Foundation
CompletedInstitutional project

Secure accounts and role-based access

Sterling IMRES founding team

Sign-in and sign-up backed by Supabase authentication, with each login mapped to a user or administrator role and an upload permission, as the blueprint requires before any admin area is introduced.

Foundation